1799 Results found

Replacement of Measurement with inverted Syphon

Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o

Determination of Infiltration Water in small Pipelines

Determination of Infiltration Water in small Pipelines Channel Networks - Portable Measurements Application Concrete pipe DN 250 Partially filled, low level Very low flow rates Ex Zone 1 No mains power supply available Definition of tasks Continuous flow rate measurement to determine the extraneous

Flow Measurement in Venturi Flume

Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi

Flow Measurement Impoundage Shield

Flow Measurement Impoundage Shield Wastewater Treatment Plant - Discharge Area Application Pipe DN 400, made of stainless steel Partially filled Only short measuring section available Low nightly discharge Definition of tasks Implementation of discharge measurement to replace flat-rate billing using

Sludge Flow Measurement in Recirculation Line

Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Fully filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scr

Hot Sludge Flow Measurement

Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti

Open Channel Flow Measurement

Open Channel Flow Measurement Wastewater Treatment Plant - Intake Area Application Rectangular channel made of concrete, width 1m Partially filled Strong fluctuation between daily and nightly inflow Definition of tasks Continuous flow rate measurement in a WWTP intake area Additional external level

Partial Discharge Section Flow Measurement

Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re

Return Sludge Flow Measurement

Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Fully filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the se

Flow Measurement Using Inverted ''Goose Neck'' Syphon

Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.
Team NIVUS
Im Täle 2
75031 Eppingen